Prompt
“Vertical 9:16, 15s. Start with a mattress on the floor. Rapid jump cuts: (1) cutting 2x lumber for a low platform frame, (2) assembling frame with screws, (3) adding center supports and legs, (4) screwing on plywood deck, (5) building two simple box nightstands that attach to the platform sides, (6) sanding all edges, (7) staining or painting the entire unit, (8) dropping mattress onto platform, (9) adding lamps on the integrated nightstands, (10) styling with bedding and pillows, (11) final bedroom wide shot with a 7–8% punch-in on the headboard area.”
video
“Vertical 9:16, 15s. Start with a mattress on the floor. Rapid jump cuts: (1) cutting 2x lumber for a low platform fr...
Sora 2video:sora2-text-to-video-standardTexto para vídeo
5 de fev. de 2026, 06:03
Configurações
Fornecedor
Sora 2
Modelo
video:sora2-text-to-video-standard
Criado
5 de fev. de 2026, 06:03
Créditos
60
Modo
Texto para vídeo
Proporção da imagem
portrait
Criar Algo Semelhante
O gerador abaixo pré-seleciona o modelo usado para este registro, para que você possa remixar a ideia mais rapidamente.
Novas tarefas aparecem aqui após o envio.